26.1.17
On-site: Zach kKeys, mMaeve kKeys and Stephen Keys ; start time 7:30 AM. w
We started to dig down for the shaft weand built two rings, wrapped with polish. Damon and plastic type the steel and poured 23 m of concrete.
The text above was approved for publishing by the original author.
Previous
     
Next
Basta ir para Caixa de Entrada, clicar no link de confirmação que enviamos e receberá o texto corrigido de volta. Se quiser corrigir mais e-mails, você pode simplesmente:
Ou